Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the feedzy-rss-feeds domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/larutaiy/trabajandoconluis.com/wp-includes/functions.php on line 6114
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-plugin-mojo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/larutaiy/trabajandoconluis.com/wp-includes/functions.php on line 6114
{"id":80818,"date":"2021-07-06T09:25:05","date_gmt":"2021-07-06T13:55:05","guid":{"rendered":"https:\/\/lavozdelprm.org\/?p=80818"},"modified":"2021-07-06T09:25:05","modified_gmt":"2021-07-06T13:55:05","slug":"rdmopc-cierra-a-partir-de-esta-noche-tuneles-y-elevados-del-gsd","status":"publish","type":"post","link":"https:\/\/trabajandoconluis.com\/?p=80818","title":{"rendered":"@RDMOPC Cierra a partir de esta noche t\u00faneles y elevados del GSD"},"content":{"rendered":"\n
<\/p>\n\n\n
Ministerio de Obras P\u00fablicas y Comunicaciones (MOPC)<\/strong><\/h2>\n\n\n
<\/p>\n\n\n
El Ministerio de Obras P\u00fablicas y Comunicaciones (MOPC) inform\u00f3 que en la semana comprendida del lunes 5 al s\u00e1bado 10 de julio llevar\u00e1 a cabo trabajos de mantenimiento en pasos a desnivel (que incluye elevados y t\u00faneles) ubicados en el Gran Santo Domingo.<\/p>\n\n\n
Los trabajos a realizar, que ser\u00e1n en el horario de 10:00 de la noche a 5:00 de la ma\u00f1ana del d\u00eda siguiente.<\/p>\n\n\n
Para este lunes y hasta el s\u00e1bado tocar\u00e1 al corredor de la avenida John F. Kennedy, donde se har\u00e1n trabajos de preparaci\u00f3n de superficie para pintura, lo que no requiere cierre.<\/p>\n\n\n
Tambi\u00e9n, este lunes se dar\u00e1 mantenimiento al t\u00fanel de la avenida N\u00fa\u00f1ez de C\u00e1ceres; los pasos a desnivel de la N\u00fa\u00f1ez de C\u00e1ceres con George Washington (puente seco); los elevados de la Winston Churchill con John F. Kennedy (Sur-Oeste); de la John F. Kennedy con Winston Churchill (Este-Sur); el puente Jacobo Majluta, todos en cierre total. El t\u00fanel de la N\u00fa\u00f1ez de C\u00e1ceres (no requiere cierre).<\/p>\n\n\n