Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the feedzy-rss-feeds domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/larutaiy/trabajandoconluis.com/wp-includes/functions.php on line 6114
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-plugin-mojo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/larutaiy/trabajandoconluis.com/wp-includes/functions.php on line 6114
{"id":76300,"date":"2021-04-20T08:31:48","date_gmt":"2021-04-20T13:01:48","guid":{"rendered":"https:\/\/lavozdelprm.org\/?p=76300"},"modified":"2021-04-20T08:31:48","modified_gmt":"2021-04-20T13:01:48","slug":"alcaldiadn-carolinamejiag-inaugura-nuevo-bulevar-de-honduras-en-la-avenida-independencia","status":"publish","type":"post","link":"https:\/\/trabajandoconluis.com\/?p=76300","title":{"rendered":"@AlcaldiaDN @CarolinaMejiaG inaugura nuevo Bulevar de Honduras en la Avenida Independencia"},"content":{"rendered":"\n
<\/p>\n\n\n
El sector Honduras ya cuenta con un nuevo bulevar<\/h3>\n\n\n
<\/p>\n\n\n
El paseo cuenta con elementos de accesibilidad universal como rampas y cambios de nivel estandarizados, se\u00f1al\u00e9ticas adecuadas reconstrucci\u00f3n de m\u00e1s de 900 metros lineales de cont\u00e9n y la integraci\u00f3n de mobiliarios urbanos.<\/h4>\n\n\n