Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the feedzy-rss-feeds domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/larutaiy/trabajandoconluis.com/wp-includes/functions.php on line 6114
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-plugin-mojo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/larutaiy/trabajandoconluis.com/wp-includes/functions.php on line 6114
{"id":63605,"date":"2020-11-26T23:17:21","date_gmt":"2020-11-27T03:47:21","guid":{"rendered":"https:\/\/lavozdelprm.org\/?p=63605"},"modified":"2020-11-26T23:17:21","modified_gmt":"2020-11-27T03:47:21","slug":"deligneab-mopcrd-obras-publicas-inicio-hoy-construccion-de-la-circunvalacion-de-bani","status":"publish","type":"post","link":"https:\/\/trabajandoconluis.com\/?p=63605","title":{"rendered":"@DeligneAB @MOPCRD Obras P\u00fablicas inici\u00f3 hoy construcci\u00f3n de la circunvalaci\u00f3n de Ban\u00ed"},"content":{"rendered":"\n
<\/p>\n\n\n
Obra que contribuir\u00e1 con el desarrollo econ\u00f3mico, social y tur\u00edstico de las distintas provincias de la regi\u00f3n Sur<\/strong><\/h3>\n\n\n
<\/p>\n\n\n
BAN\u00cd.-El gobierno del Presidente Luis Abinader, a trav\u00e9s del Ministerio de Obras P\u00fablicas, dej\u00f3 iniciados este mi\u00e9rcoles los trabajos de construcci\u00f3n de la Circunvalaci\u00f3n de Ban\u00ed, por un monto de 2,200 millones de pesos, obra que contribuir\u00e1 con el desarrollo econ\u00f3mico, social y tur\u00edstico de las distintas provincias de la regi\u00f3n Sur, y que era reclamada desde hace varios a\u00f1os.<\/strong><\/p>\n\n\n
El ministro Deligne Ascenci\u00f3n, al encabezar el acto de apertura, dijo que la Circunvalaci\u00f3n de Ban\u00ed contribuir\u00e1 con el desarrollo econ\u00f3mico no solo de la provincia Peravia, sino tambi\u00e9n de las nueve provincias de la regi\u00f3n Sur del pa\u00eds.<\/p>\n\n\n
Adelant\u00f3 que pondr\u00e1n los mayores esfuerzos para que la circunvalaci\u00f3n est\u00e9 concluida antes del a\u00f1o 2021, dio garant\u00edas que el gobierno del Presidente Abinader da se\u00f1ales de que est\u00e1 comprometido con los intereses de la ciudadan\u00eda, y que dar\u00e1 continuidad a las obras que por muchos a\u00f1os ha demandado la poblaci\u00f3n dominicana.<\/p>\n\n\n